Primavera P6 scheduling

Primavera P6 scheduling consultants for construction projects

Plan104 builds, updates and reviews construction schedules in Oracle Primavera P6. We give general contractors and owners a P6 schedule with sound logic, clear coding and narratives that the project team, the owner and the field can all rely on.

Primavera P6 services

P6 baseline development

Work breakdown structure, activity codes, calendars, logic and durations set up to meet the contract specification on the first submission.

P6 schedule updates

Progress, actual dates, remaining durations and logic revisions every period, with a narrative and critical path comparison against the previous update.

Resource and cost loading

Manpower and cost loaded activities so you can see crew demand by trade and by week, and support earned value reporting.

P6 schedule reviews

Independent checks of logic, open ends, constraints, lags, float and calendar settings, with a clear list of corrections.

Recovery and what-if scenarios

Copies of the live schedule used to test resequencing and acceleration options before anything changes in the field.

Time impact analysis in P6

Fragnets inserted into the contemporaneous update to measure the impact of changes on the completion date. More on TIA

What a good P6 schedule looks like

A reliable Primavera P6 schedule has complete logic with no open ends, few hard constraints, realistic durations, calendars that match the work, and a critical path that makes sense to the superintendent. Every update should explain what moved and why. That is the standard we build to, and it is what keeps a schedule credible when the owner reviews it or when a delay claim is prepared.

From P6 to the field

Plan104 also connects your P6 schedule to the job site. Our construction operations platform turns the schedule into a live simulation and personal daily work reports, so the people doing the work see the same plan the scheduler maintains. See all construction scheduling services.

Frequently asked questions

Do you work directly in our P6 database?

Yes. We can work in your Primavera P6 environment or deliver XER files, depending on how your company manages schedules.

Can you fix a P6 schedule that the owner rejected?

Yes. We review the comments, correct logic, constraints and coding, and resubmit a schedule that meets the specification.

Do you provide P6 schedule narratives?

Yes. Every update includes a narrative that explains progress, the critical path, changes in float and any risks to the completion date.

Do you support owners as well as contractors?

Yes. We prepare schedules for contractors and review contractor schedules on behalf of owners and owner's representatives.

Talk to a Plan104 scheduler

Tell us about your project and where the schedule stands today. We will show you how we would build, update or recover it, and how the platform puts it in front of every crew on site.

More from Plan104